Project description
Shele Bridge is the bridge across the Fenhe River from Jiancao North Street (Shele Street). It is located between the North Central Ring Bridge and the Chaicun Bridge. It is an important bridge connecting the east and west areas of the city in the north of Taiyuan City. It is the main project to be constructed in Taiyuan City in the near future. After completion, the bridge will become the 18th bridge across the Fen River in Taiyuan. Shele Bridge Construction Project: The starting point is Binhe East Road and the end point is Binhe West Road, with a total length of about 780 meters and a planned red line width of 50 meters.
The cross bridge of the main tower of Shele Bridge is “A” shape, without cross beams, with a total height of 113 meters. The lower tower is made of reinforced concrete and is about 20.5 meters high. The middle tower and the upper tower are steel structures with a height of about 92.5 meters.
The Shele Bridge is a cable-stayed bridge in the true sense, with a twisted surface as a whole, with obvious three-dimensional effect. The bridge using the cable-stayed structure, due to the large span, can ensure the normal traffic under the bridge and reduce the amount of pier construction. TorcStark technical team has provided heavy-duty jacking and translation engineering solutions for many bridges. In view of the working conditions of this bridge, our company has finally designed a set of computer-controlled heavy-duty high-precision synchronous jacking and crawler jacking system equipment solutions after many technical exchanges with the builder’s technical team. The solution finally perfectly realizes the technical problems of multi-point synchronous lifting and long-distance translation.
TorcStark technical team has carried out a variety of protection designs for the core jacking and moving beam equipment, such as waterproof, sand-proof, anti-collision, etc., to ensure that the core jacking and moving beam equipment can be used without failure under the conditions of project implementation, and provide whole-process technical support services.
TorcStark has a technical team that has been engaged in heavy-duty synchronous jacking and transfer engineering for many years and has rich experience. Therefore, TorcStark not only provides high-quality synchronous jacking equipment, but also provides “one-stop” engineering solutions: early-stage technical solution design and seminar services, mid-stage equipment manufacturing services, and late-stage on-site professional services. After the technical requirements of the project are confirmed, TorcStark has been serving the whole process of project implementation, providing all services in the process of project implementation.